City of Carterville Water & Sewer Board met May 8.
Here is the agenda provided by the Board:
1. Delinquent Accounts (_ ____ accounts - $___________) Cutoff date 05/09/17
2. Minutes
3. Treasurer’s Report – April 2017
4. Bills for May 2017
5. Water Loss – April 2017 Sold 11,641.530___ Gallons
Purchased ____________ Gallons Water Loss ________ _ Gallons‘
6. Garry Wiggs Report
Electronic Water Meters – Update
Water Tank Repairs – Notice to Proceed to sign
7. Marc Buatte Report (Sewer)
Pea Ridge Lift Station – IEPA Permit
Crawford and Associates – Engineering - $500.00
Madison Ridge Lift Station – Pumps - Update
Kamper Supply Lift Station – Update
Aeration Diffuser – Site Visit to be scheduled to Charleston, IL
8. Leak Credits and Pool Credits
9. Crawford & Associates
Sewer Plant Study - Update
2013 WATER Study:
Hydrant flows tabulated
Preliminary maps showing low flows prepared
Grant application started for additional water main installation
Income surveys for grant started
10. Downtown Water Main Replacement - Update
11. West Grand Phase II Waterline - Update
12. Sludge Holding Structure – Update
13. Meeting with Rend Lake about Service Line
14. Texas and Willow Sewer Repair – KPS – Work Scheduled for May 3
15. Telemetry for Lift Stations – Hide Tide Telemetry
16. Replacement of Glass Front Doors
17. Bank Facility Transfer
18. Employee Salary Increases and Department Structure
19. Water and Garbage Rate Increases
Executive Session
Personnel, Possible Litigation, Possible Sale of Bonds, Possible Acquisition of Property
https://visitcarterville.com/sites/default/files/Water%20and%20Sewer%20Board%20Agenda%20May%208%2C%202017_0.pdf